(1)Lifting
Because extruder's space is relatively large, and the weight is relatively high, so when lifting, it is suggested that lift all extruder's parts after the demolition of the main components. Its major components can be disassembled into feed conditioner, the host, the main motor and some other parts.
When you lift the extruder's parts, you can't make oppression, collision damage in the whole process of lifting, dismantling and assembling. On the lifting process, rope should be able to withstand the equipment and is not allow too short, so as not to damage the lifting equipment, but we do not require that each rope angle is 60 °, in fact, less than 60 °is better. The equipment's load carrying capacity is greater 1.2 time than the equipment itself.
(2)Transportation
a. When the equipment come out form the factory, you can choose whether you can use the packing box according to the actual situation.
b. If the box is not used, the rain-proof measures should be taken, and transport and equipment should prevent collision and overturning.
c. When using the box, the machine and accessories in the box should be fixed firmly, and with the distance left between the container wall to prevent damage in transit collision.
d. When transporting, the machine can not be reversed and crushed.
e. The equipment can be loaded into a container for transporting.
(3)Inspection
a. When equipment arrives, you should carefully exam whether there is something wrong with the machine.
b. Check the packing list carefully, and count random file attachments, and make unpacking records.
(4)Storage
a. When you place the equipment outdoor, you should have anti-rain, anti-sun and anti-water facilities, indoor storage should be taken good ventilation and moisture-proof measures.
b. Long-term storage, the machine should be placed in ventilated, dry, cool place, and should get rain and moisture facilities, unpainted surfaces should be coated with anti-rust oil leakage.